THIS WEEK THE WORKS HAVE STARTED

In fact, it would have to be said that the preparations for the works have begun. At the rear of the church a container with material has already been installed. The work booths will be installed shortly and the area reserved for exterior work will begin in the “tunnel” area, marking sufficient safety margins so that they do not interfere with the presence of students at recess.

In the same way, the entire front of the Moure altarpiece has already been scaffold so that it can be fully protected, before raising the rest of the scaffolding that will completely cover the presbytery.

For a sample we attach three photos that speak for themselves.

Tú carrito